Concrete Case Histories
Solutions
  EPA Upgrade Requirements
  Underground Storage Tank Owners Can Control EPA Compliance Costs
  Predicting Corrosion Failure of USTs using MTCF™
  Electroremediation
  Corrpro's Technology Improves Pipeline Reliability
  Ocean City Research Corp. Completes FHWA Bridge Coatings Studies
  Ocean City Research Corp. Demonstrates Hot-Dip Galvanizing of Assembled Truck Cab for the U.S. Army
  Corrpro Protects Neptune Spar Hull
  Major Pipeline Company Awards Cathodic Protection Contract to Corrpro
  Ground Storage Tanks in China
  Corrpro Protects the Queen's Navy
  Corrpro Implements In-Situ Pipeline Repairs in Hawaii
  Don't Gamble On Corrosion
  Corrpro Investigates Water Main Failure
  Corrpro Protects Resort Hotel in Seychelle Islands
  Unique Design Protects Pipelines in Wetlands Area
  Wilson Walton's Marine Anti-Fouling System, a Green Solution for the "Green Island"

Toll free number: 1-866-CORRPRO
     
 
   
Corrpro Case History No. 1 - Crown Center Parking Garage Kansas City, Missouri
Corrpro Case History No. 2 - 40 Westminster St. Parking Garage Providence, Rhode Island
Corrpro Case History No. 3 - Connecticut DOT Bridge Deck Cathodic Protection
Corrpro Case History No. 4 - Florida DOT Substructure Protection in Marine Environment
Corrpro Case History No. 6 - Kwai Chung Container Berth Concrete Wharf Cathodic Protection
Corrpro Case History No. 7 - Cathodic Protection of a Reinforced Concrete Building Facade Seychelle Islands
Corrpro Case History No. 8 - Virginia DOT Hampton Roads Bridge-Tunnel
Corrpro Case History No. 9 - Ocean Pines Condominium, Highland Beach, FL
Corrpro Case History No. 10 - Ocean Towers South Condominium, Jupiter, FL
Corrpro Case History No. 11 - Gulf Mariner Condominium, Redington Shores, FL
Corrpro Case History No. 12 - Cote d’Azur Condominium, Singer Island, FL
Corrpro Case History No. 13 - Watermark Condominium, New Smyrna Bch, FL
 
   
  Corrpro Case History No. 12  
  Cathodic Protection of Reinforced Concrete Structures
Cote d’Azur Condominium,
Singer Island, FL
 
     
 
Project Description:
Cote d’Azur Condominium on Singer Island in West Palm Beach, Florida, was constructed in the early seventies and consists of two 18 story towers separated by a large plaza deck with parking underneath. There are 206 units with a total of 340 balconies, all of which received Corrpro’s impressed current cathodic protection (CP) system for corrosion control of the reinforcing steel. CP was also installed on the roof overhangs and will later be added to the plaza support columns.

Problem:
The condominium Board began an intensive investigation into various techniques for concrete restoration in 1998 and as a result two engineering surveys were completed over a two year period. In March of 2000, the membership approved a special assessment to pay for concrete restoration and a CP system. Having made that step, the Board then needed to decide on the best corrosion control solution for their buildings. One of the major problems they faced was the magnitude of balcony repair and the associated noise and dust that would accompany a restoration contract of this size.

Solution:
The Board, with considerable input from their engineers, elected to install ELGARD’s™ titanium anode mesh CP system, which is encased in a thin-set mortar under new ceramic tiles. The roof overhangs were also protected by installing the ELGARD™ ribbon mesh in slots cut into the underside.

The plaza deck support columns (see photo "Cote d’Azur Condominium") will be protected by the same slotted ribbon, only installed vertically (Phase II).

Performance:
The entire system is powered and monitored by Corrpro’s rectifier and CORD-COM™ remote monitoring system. The system is operating at optimum voltage and current levels to control further corrosion of the reinforcing steel in the concrete balconies, walkways, roof slabs and entrance canopy. Corrpro will continue to monitor the CP system remotely from its head office in Medina, Ohio.

Value:
The benefits to the Owners can be summed-up in a quote from the Board President Dr. Murray Low: “The process of a project like this is very disruptive; it is costly, noisy and difficult to live through. The long-term reality, however, is you won’t have to deal with corrosion on your balconies for 20 years”. When properly maintained, the CP system will provide a minimum 25-year life expectancy against corrosion of the concrete embedded reinforcing steel.

Project Data:

Structure:
Cote d’Azur Condominium
4200 North Ocean Drive
Singer Island, FL 33404
Owner:
Cote d’Azur Condominium Association
Owner Contact:
Dr. Murray Low, Board President
Tel: (914) 328 6966
Building Manager:
Ms. Lin Sommers
Tel: (561) 844 6259
Engineer:
Southern Cathodic Protection
Engineer Contact:
Mr. John Piazza, PE
Tel: (800) 869 3901
Anode Type & Size:
ELGARD™ 150 Anode Mesh and 100 Anode Ribbon (62,000 ft2)
Contractors:
Southern Cathodic Protection and Orion Contracting
Installation Date:
2002

Leading governmental and independent trade organizations have monitored, tested, and reported on corrosion control strategies over the past three decades. These groups include the American Concrete Institute, National Association of Corrosion Engineers, and the Federal Highway Administration. They advocate CP as the only rehabilitation technique that effectively stops corrosion in salt-contaminated structures, regardless of the chloride content in the concrete.

Corrpro Companies, Inc., (AMEX: CO), is the leading provider of corrosion engineering services, materials and systems for the infrastructure, environmental and energy markets throughout the world. For reinforced concrete structures, our involvement has been in many areas including CP system design, installation, testing, coatings evaluation, research and development. Corrpro is the worldwide licensee of the ELGARD™ system for CP of reinforced concrete structures.

ELGARD™ is a trademark of Eltech Systems Corporation.

 
     
News & Events
   

Corrpro Posts Financial Statements for the quarterly period ended December 31, 2007 more»

Corrpro Posts Financial Statements for Quarter Ended September 30, 2007 more»
   
 
The plaza deck support columns will be protected by the same slotted ribbon, only installed vertically (Phase II).
 
Balcony repair in progress
 
Finished balcony with mesh under tile

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
Google